{"id":53623,"date":"2023-03-20T16:45:36","date_gmt":"2023-03-20T11:15:36","guid":{"rendered":"https:\/\/corpbiz.io\/learning\/?p=53623"},"modified":"2023-03-20T16:45:37","modified_gmt":"2023-03-20T11:15:37","slug":"how-to-conduct-eia-for-cmswmf","status":"publish","type":"post","link":"https:\/\/corpbiz.io\/learning\/how-to-conduct-eia-for-cmswmf\/","title":{"rendered":"How to Conduct EIA for CMSWMF?"},"content":{"rendered":"\n<p>Environmental\nImpact Assessment (EIA) for Common Municipal Solid Waste Management Facility (CMSWMF)\nis a process of identifying, predicting, evaluating and mitigating the social,\nbiophysical, and other relevant impacts of the developmental proposal prior to\na major decision being taken and a commitment made. The study of EIA for CMSWMF\nintegrates the environmental concerns of various activities into the processes\nof decision-making.<\/p>\n\n\n\n<p>The Project\/activity is covered\nunder category B of item 7 (i) Common Municipal Solid Waste Management Facility\n(CMSWMF)&#8217; of the Schedule to the EIA Notification, 2006 and its amendments, and\nrequires appraisal (EC) at State Level (SEIAA). However, due to the absence of\nSEIAA\/SEAC, the proposal has been appraised at the Central level by sectoral\nEAC.<\/p>\n\n\n\n<p>The\nfollowing is the categorisation for project that requires EIA\nfor Common Municipal Solid Waste Management Facility for obtaining prior Environmental\nClearance:<\/p>\n\n\n\n<ul><li><strong>Category \u2018B\u2019 projects<\/strong>:\nRequires an EIA for CMSWMF (In case of\nLandfill disposal site)<\/li><\/ul>\n\n\n\n<p><strong>Note: <\/strong>In\ncase of General conditions, the project will be treated as Category \u201cA\u201d. <\/p>\n\n\n\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_82_2 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title ez-toc-toggle\" style=\"cursor:pointer\">Page Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 eztoc-toggle-hide-by-default' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/corpbiz.io\/learning\/how-to-conduct-eia-for-cmswmf\/#Applicability_of_EC_for_CMSWMF\" >Applicability of EC for CMSWMF<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/corpbiz.io\/learning\/how-to-conduct-eia-for-cmswmf\/#The_Objective_of_Conducting_EIA_for_CMSWMF\" >The Objective of Conducting EIA for CMSWMF<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/corpbiz.io\/learning\/how-to-conduct-eia-for-cmswmf\/#Clearance_and_NOCs_Required_For_Conducting_EIA_for_CMSWMF\" >Clearance and NOCs Required For Conducting EIA for CMSWMF<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/corpbiz.io\/learning\/how-to-conduct-eia-for-cmswmf\/#Applicable_Laws_Legislations\" >Applicable Laws &amp;\nLegislations<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/corpbiz.io\/learning\/how-to-conduct-eia-for-cmswmf\/#How_to_Carry_Out_EIA_for_CMSWMF\" >How to Carry Out EIA for CMSWMF<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/corpbiz.io\/learning\/how-to-conduct-eia-for-cmswmf\/#Submission_Process_of_Final_EIA_for_Common_Municipal_Solid_Waste_Management_Facility\" >Submission\nProcess of Final EIA for Common Municipal Solid Waste Management Facility<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/corpbiz.io\/learning\/how-to-conduct-eia-for-cmswmf\/#Generic_Structure_of_EIA_for_CMSWMF\" >Generic Structure of EIA for\nCMSWMF<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/corpbiz.io\/learning\/how-to-conduct-eia-for-cmswmf\/#Annexures_required_for_preparation_of_EIA_for_CMSWMF\" >Annexures required for\npreparation of EIA for CMSWMF<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/corpbiz.io\/learning\/how-to-conduct-eia-for-cmswmf\/#Composition_of_Team_of_Experts\" >Composition of Team of Experts<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/corpbiz.io\/learning\/how-to-conduct-eia-for-cmswmf\/#Conclusion\" >Conclusion<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Applicability_of_EC_for_CMSWMF\"><\/span>Applicability of EC for CMSWMF<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>As\nper EIA Notification 2006 and its subsequent OM and circular dated 7.11.2017 Expert\ngroup revisited the process of obtaining prior EC regarding:<\/p>\n\n\n\n<ul><li><strong>Applicability of EC:<\/strong>\nProposing a new Landfill Disposal Site<\/li><li><strong>Non-Applicability of EC: <\/strong>Door-to-door\ncollection<strong>, <\/strong>segregation, composting, refused derived fuel (RDF)<\/li><\/ul>\n\n\n\n<p>Locating a landfill site or municipal solid waste (MSW) disposal site is a contentious issue, and there is a tendency to locate them far from the habitation but near forests, rivers, ponds, wetlands and low-lying areas that are critical from environmental points, of view, it may not be appropriate to exempt this activity of MSW disposal site or landfill site from the requirement of prior EC.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" width=\"1024\" height=\"489\" src=\"https:\/\/corpbiz.io\/learning\/wp-content\/uploads\/2023\/03\/image-6-1024x489.png\" alt=\"Waste Management Hierarchy\" class=\"wp-image-53625\" srcset=\"https:\/\/corpbiz.io\/learning\/wp-content\/uploads\/2023\/03\/image-6-1024x489.png 1024w, https:\/\/corpbiz.io\/learning\/wp-content\/uploads\/2023\/03\/image-6-300x143.png 300w, https:\/\/corpbiz.io\/learning\/wp-content\/uploads\/2023\/03\/image-6-768x367.png 768w, https:\/\/corpbiz.io\/learning\/wp-content\/uploads\/2023\/03\/image-6.png 1070w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><strong>Figure\n1.1: Waste Management Hierarchy<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"The_Objective_of_Conducting_EIA_for_CMSWMF\"><\/span>The Objective of Conducting EIA for CMSWMF<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul><li>The major purpose of this report\nis to prepare an environmental statement on the assessment of the likely environmental\nimpacts of the proposed Integrated Municipal Solid Waste Management Facility.<\/li><li>Management of solid waste is of\ngrowing concern to the general public at large, local authorities and business\ncommunities in cities and towns across India. In order to comply with Municipal\nSolid Waste (Management and Handling) Rules, 2016, proper collection,\nsegregation, recycling and disposal are much needed.<\/li><li>Conducting an EIA for Common\nMunicipal Solid Waste Management Facility develop mitigation measures so as to minimize\npollution, environmental disturbance and nuisance during the operation period\nof the proposed project.<\/li><\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Clearance_and_NOCs_Required_For_Conducting_EIA_for_CMSWMF\"><\/span>Clearance and NOCs Required For Conducting EIA for CMSWMF<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ol><li>Forest Clearance<\/li><li>Wildlife Clearance (NBWL)<\/li><li>CRZ Clearance (Coastal Regulation Zone) as per issued notification 2011<\/li><li>Central Ground Water Authority (CGWA) NOC<\/li><li>Forest Certificate<\/li><li>Site-specific conservation plan &amp; Wildlife Management Plan (in case of the presence of schedule-I species in the study area) approved by the chief wildlife warden.<\/li><\/ol>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Applicable_Laws_Legislations\"><\/span>Applicable Laws &amp;\nLegislations<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul><li>Municipal Solid Waste (M&amp;H)\nRules, 2016<\/li><li>Plastic waste management Rules\n2016 amended in 2022<\/li><li>The Hazardous Waste (M&amp;H)\nRules, 1989<\/li><li>Hazardous Waste (Management,\nHandling &amp; Transboundary Movement) Rules 2008<\/li><li>Environment (Protection) Act,\n1986<\/li><li>EIA Notification, 2006<\/li><li>Air (P&amp;CP) Act, 1981<\/li><li>Water (P&amp;CP) Act, 1974<\/li><li>Forest (Conservation) Act, 1988<\/li><li>Wildlife (Conservation) Act, 1972<\/li><\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"How_to_Carry_Out_EIA_for_CMSWMF\"><\/span>How to Carry Out EIA for CMSWMF<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Submission\nof EIA for Common Municipal Solid Waste Management Facility on the basis of approved\nToR letter issued by SEAC\/SEIAA further requires prior EC as per EIA\nNotification.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Stages Involved In the EIA Process<\/h3>\n\n\n\n<ul><li><strong>Screening-\n<\/strong>This stage aware the\nproject proponent of their obligations before deciding on the budget, project\ndesign and execution plan. Also, decides if an EIA is required or not.<\/li><li><strong>Scoping<\/strong>\n\u2013 To identify the environmental impacts of the project and defines the scope of\nstudy in the EIA report.<\/li><li><strong>Term\nof Reference<\/strong> (ToR)\u2013 After the scoping stage, the project\nproponent\/consultant applies at the state level (SEIAA\/SEAC). It consists of\nthe scope of the project and the timeline for carrying out an EIA.<\/li><li><strong>Draft\nEnvironmental Impact Assessment <\/strong>Report \u2013 The draft report\nof an EIA includes all the baseline details of the project, its impacts and the\ndevelopment of mitigation measures accordingly.<\/li><li><strong>Public\nConsultation <\/strong>\u2013 This stage plays a major role in the entire\nstage of the EIA for CMSWMF. A public hearing conducts at the project site, and\nthe proposal is presented in front of the public for their opinion and views on\nthe existing or proposed project.<\/li><li>Final EIA \u2013 Final EIA for CMSWMF is\nprepared after the incorporation of PH minutes by the Pollution control board\nand submitted to the central or state level for review.<\/li><li><strong>Appraisal\n<\/strong>\u2013 It decides whether the Environmental Impact\nAssessment is satisfactory or not. On that basis, the concerned authority\ngrants the EC or rejects it accordingly.<\/li><\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Submission_Process_of_Final_EIA_for_Common_Municipal_Solid_Waste_Management_Facility\"><\/span>Submission\nProcess of Final EIA for Common Municipal Solid Waste Management Facility<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul><li>Identification of the site and a preliminary site visit by the project proponent and consultant for the preparation of a checklist.<\/li><li>Registration on the Parivesh portal by the Environment consultant.<\/li><li>Drafting and submission of forms (Form 1, PFR) for the ToR after registration<\/li><li>Drafting of presentation for ToR<\/li><li>Agenda\/Meeting for ToR<\/li><li>Grant of ToR by Appraisal Committee      (SEIAA)&nbsp;and subsequently baseline data      generation by NABL-approved Lab<\/li><li>Submission of Draft EIA report for      conduction of public hearing to SPCB<\/li><li>Presentation and Conduct of Public      hearing<\/li><li>Submission of final EIA report to      SEAC for the grant of EC after incorporation of Public Hearing minutes in      the EIA report and submission on the <strong>Parivesh portal<\/strong><sup><a class=\"text-primary\" href=\"https:\/\/parivesh.nic.in\/\"><strong>[1]<\/strong><\/a><\/sup><\/li><li>Drafting of final EC presentation<\/li><li>Agenda\/Meeting for final EC<\/li><li>Grant of EC by the appraisal committee<\/li><\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Generic_Structure_of_EIA_for_CMSWMF\"><\/span>Generic Structure of EIA for\nCMSWMF<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<table class=\"wp-block-table table table-bordered\"><tbody><tr><td>\n  <strong>Chapter No.<\/strong>\n  <\/td><td>\n  <strong>EIA Structure<\/strong>\n  <\/td><td>\n  <strong>Contents<\/strong>\n  <\/td><\/tr><tr><td>\n  1.\n  <\/td><td>\n  Introduction\n  <\/td><td>\n  Presents an introduction along\n  with the scope and objective of this EIA study.\n  <\/td><\/tr><tr><td>\n  2.\n  <\/td><td>\n  Project Description\n  <\/td><td>\n  Presents brief project\n  technical details.\n  <\/td><\/tr><tr><td>\n  3.\n  <\/td><td>\n  Description of the Environment\n  <\/td><td>\n  Baseline status for various environmental\n  parameters in the study area.\n  <\/td><\/tr><tr><td>\n  4.\n  <\/td><td>\n  Anticipated Environmental\n  Impacts and mitigation measures\n  <\/td><td>\n  Identification, prediction, and\n  evaluation of environmental impacts due to the proposed project activities.\n  Also presents proposed mitigation measures.\n  <\/td><\/tr><tr><td>\n  5.\n  <\/td><td>\n  Analysis&nbsp; of&nbsp;\n  Alternatives \n  (Technology\n  &amp; site)\n  <\/td><td>\n  Describes alternative sites and\n  technologies considered for this project.\n  <\/td><\/tr><tr><td>\n  6.\n  <\/td><td>\n  Environmental \n  Monitoring Program\n  &nbsp;\n  <\/td><td>\n  Details of monitoring, audit\n  and reporting.\n  <\/td><\/tr><tr><td>\n  7.\n  <\/td><td>\n  Additional Studies\n  <\/td><td>\n  Describes details of public\n  consultation, Risk Assessment and Disaster&nbsp; &nbsp;Management Plan,\n  Social Impact assessment,&nbsp;&nbsp;\n  <\/td><\/tr><tr><td>\n  8.\n  <\/td><td>\n  Project benefits\n  <\/td><td>\n  Improvement in physical\n  infrastructureImprovement in social\n  infrastructureEmployment potential \u2013 skilled,\n  semi-skilled and unskilledOther tangible benefits\n  \n  \n  \n  <\/td><\/tr><tr><td>\n  9.\n  <\/td><td>\n  Environmental Cost benefits\n  <\/td><td>\n  If recommended at the Scoping stage\n  <\/td><\/tr><tr><td>\n  10.\n  <\/td><td>\n  Environment Management Plan (EMP)\n  <\/td><td>\n  Description of the\n  administrative aspects to ensure whether mitigative measures are implemented\n  or not, and their&nbsp; effectiveness\n  monitored after the approval of EIA\n  <\/td><\/tr><tr><td>\n  11.\n  <\/td><td>\n  Summary &amp; Conclusion (Summary\n  of EIA report)\n  <\/td><td>\n  Describes the overall\n  justification of the project and how adverse impacts will be mitigated.\n  <\/td><\/tr><tr><td>\n  12.\n  <\/td><td>\n  Disclosure of Consultants\n  engaged\n  <\/td><td>\n  Company Profile with resumes of\n  team members\n  <\/td><\/tr><\/tbody><\/table>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Annexures_required_for_preparation_of_EIA_for_CMSWMF\"><\/span>Annexures required for\npreparation of EIA for CMSWMF<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul><li>ToR Letter <\/li><li>Site layout and Landfill Design\nPlan<\/li><li>Land documents with Khasra Map<\/li><li>Baseline Monitoring Data<\/li><li>Public Hearing Proceedings<\/li><li>Detailed Project Report<\/li><li>DCF certificate<\/li><\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Composition_of_Team_of_Experts\"><\/span>Composition of Team of Experts <span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul><li>NABET\nConsultant (EIA Co-ordinator, Team members, FAE, FAA)<\/li><li>NABL\nApproved Lab<\/li><li>Civil\nEngineer<\/li><li>Air\nand noise quality specialist<\/li><li>Occupational\nhealth<\/li><li>Geology\/geo-hydrology<\/li><li>Ecologist<\/li><li>Transportation\nSpecialist<\/li><li>Safety\nand health specialist<\/li><li>Sociologist,\netc.<\/li><\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Conclusion\"><\/span>Conclusion<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Carrying out an EIA for CMSWMF is very important to identify the risk associated with the projects and reduce and minimize the impacts on the environment and the human population. Land disposal of solid wastes has been practiced for centuries. In view of the growing challenge of solid waste management carrying out the <strong><a class=\"text-primary\" href=\"https:\/\/corpbiz.io\/environmental-impact-assessment-eia\">Environmental Impact Assessment<\/a><\/strong> is necessary through the help of an accredited NABET Consultant to prepare a quality report and to obtain prior Environmental Clearance.<\/p>\n\n\n\n<p><strong>Also Read<\/strong>: <br><a href=\"https:\/\/corpbiz.io\/learning\/types-of-environmental-impact-assessment\/\">Types Of Environmental Impact Assessment\n<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Environmental Impact Assessment (EIA) for Common Municipal Solid Waste Management Facility (CMSWMF) is a process of identifying, predicting, evaluating and mitigating the social, biophysical, and other relevant impacts of the developmental proposal prior to a major decision being taken and a commitment made. The study of EIA for CMSWMF integrates the environmental concerns of various [&hellip;]<\/p>\n","protected":false},"author":62,"featured_media":53653,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[3161],"tags":[3269],"acf":{"service_id":"688"},"authorName":"Shruti Garg","authorImageUrl":"https:\/\/corpbiz.io\/learning\/wp-content\/uploads\/2023\/03\/MicrosoftTeams-image22.jpg","authorDescription":"An adept Environmental and Sustainability Consultant with Masters of Science in Environmental Science, Shruti gained hands on experience in EIA Reporting, CTE\/CTO, Environmental compliances, ESG, sustainability planning and reporting, GHG Inventorization and other environmental services. Apart from her experience as a consultant, her skillset includes business development to creating sustainable solutions, client relations, and project management.\u00a0","postViews":3082,"readingTime":5,"_links":{"self":[{"href":"https:\/\/corpbiz.io\/learning\/wp-json\/wp\/v2\/posts\/53623"}],"collection":[{"href":"https:\/\/corpbiz.io\/learning\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/corpbiz.io\/learning\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/corpbiz.io\/learning\/wp-json\/wp\/v2\/users\/62"}],"replies":[{"embeddable":true,"href":"https:\/\/corpbiz.io\/learning\/wp-json\/wp\/v2\/comments?post=53623"}],"version-history":[{"count":3,"href":"https:\/\/corpbiz.io\/learning\/wp-json\/wp\/v2\/posts\/53623\/revisions"}],"predecessor-version":[{"id":53654,"href":"https:\/\/corpbiz.io\/learning\/wp-json\/wp\/v2\/posts\/53623\/revisions\/53654"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/corpbiz.io\/learning\/wp-json\/wp\/v2\/media\/53653"}],"wp:attachment":[{"href":"https:\/\/corpbiz.io\/learning\/wp-json\/wp\/v2\/media?parent=53623"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/corpbiz.io\/learning\/wp-json\/wp\/v2\/categories?post=53623"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/corpbiz.io\/learning\/wp-json\/wp\/v2\/tags?post=53623"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}